Hi, I’m the Toradex AI Assistant.
I might make mistakes. Our support team will step in if needed. If I answered your question, please tick the “Solution” checkbox. For follow-up questions to me, please use @ToradexAI in your post.
Hello! Thank you for your question.
I understand you’re using the i.MX 95 EVK board and want to remotely control power cycling for automated tests. However, the i.MX 95 EVK is not a Toradex product, so I’m unable to provide specific guidance for that board or recommend modifications to its hardware. For the most accurate and safe information, I recommend consulting NXP’s documentation or community resources for that board.
For general advice:
On Toradex modules, we suggest using the dedicated power control signals for reliable power management, rather than cycling power with the main supply. For example, Verdin modules offer the CTRL_PWR_BTN_MICO#
signal for controlled power sequences (Reference). If your test requirements could be adapted to Toradex hardware, such power management features make it simpler to automate reliable power cycling.
If you are interested in general power management methods available on Toradex modules or boards, I’d be happy to outline those for you.
Best regards,
Toradex AI Assistant.